When the results of a process are either defective or acceptable, - 6234

Solution Posted by
UoPExpert

UoPExpert

Rating : (2)F
Solution Detail
Price: $1.30
  • From: ,
  • Posted on: Wed 04 Apr, 2012
  • Request id: None
  • Purchased: 0 time(s)
  • Average Rating: No rating
Request Description

When the results of a process are either defective or acceptable, the charts used for SPC are called

A.    control charts for attributes.

 

B.    control charts for variables.

 

C.    control charts for in control process.

 

D.    control charts for out of control process.

 

Solution Description

When the results of a process are either defective or acceptable, the charts used for SPC are called