The optimum level of inspection minimizes the sum of inspection costs - 33548

Solution Posted by
yousafbhutta

yousafbhutta

Rating : (28)C
Solution Detail
Price: $5.00
  • From: Business,
  • Posted on: Tue 26 Nov, 2013
  • Request id: None
  • Purchased: 0 time(s)
  • Average Rating: No rating
Request Description

The optimum level of inspection minimizes the sum of inspection costs and the cost of passing defectives.
 
True
 
False

The amount of inspection we choose can range from no inspection at all to inspecting each item numerous times.
 
True
 
False



Quality of conformance" is concerned with whether a product or service conforms to its specifications.
 
True
 
False

A c-chart is used for:
 
ranges
 
percent defective
 
means
 
fraction defective per unit
 
number of defects per unit


A control chart used to monitor the number of defects per unit is the:
 
R-chart
 
Gantt chart
 
c-chart
 
 chart
 
p-chart

The range chart (R-chart) is most likely to detect a change in:
 
number defective
 
proportion
 
mean
 
sample size
 
variability

A process that exhibits random variability would be judged to be out of control.
 
True
 
False

The primary purpose of statistical process control is to detect a defective product before it is shipped to a customer.
 
True
 
False


The best way to assure quality is to use extensive inspection and control charts.
 
True
 
False

Organizations should work to improve process capability so that quality control efforts can become more ________.
 
necessary
 
effective
 
widespread
 
efficient
 
unnecessary


                                       

Solution Description

Please do

Attachments
Chapter 10 Quiz.docx
Chapter 10 Quiz...