OPS 571 Process Design for Riordan Manufacturing - 43039

Solution Posted by


Rating : No Rating
Solution Detail
Price: $10.00
  • From: Business,
  • Posted on: Tue 11 Feb, 2014
  • Request id: None
  • Purchased: 0 time(s)
  • Average Rating: No rating
Request Description

Write a proposal package for Riordan of no more than 1,750 words in which you include the following items:


·         The MRP for the manufacturing of the Riordan electric fans

·         A new process design for the production of the Riordan electric fans

·         A supply chain for the electric fans, taking advantage of any global opportunities available to Riordan, such as lower labor costs

·         A production forecast for the Riordan electric fans

·         An implementation plan, including a Gantt chart of the design process, for the Riordan electric fans

·         A cover letter addressed to the VP of Operations detailing how you will coordinate aggregate operations planning and TQM for the Riordan electric fans

·         Conclusion

·         At least three references (at least two from scholarly journals from the Library)


Format your paper consistent with APA guidelines.

Solution Description

The paper is posted, please rewrite to avoid

OPS 571 Week 6 LT Process Design for Riordan Manufacturing.doc
OPS 571 Week 6 ...