Master production schedule (Graded A+) - use as a guide only - 26138

Solution Posted by


Rating : (80)A
Solution Detail
Price: $12.00
  • From: Business,
  • Posted on: Thu 26 Sep, 2013
  • Request id: None
  • Purchased: 0 time(s)
  • Average Rating: No rating
Request Description



Answer the questions in Microsoft Word. Each question is worth 10 points and partial credit will be given.  FOR MAXIMUM PARTIAL CREDIT SHOW ALL WORK.


1.            Prepare a master production schedule (MPS) chart using the following information.  Weekly Demand (weeks 1 thru 6): 810; 1350; 1100; 1000; 610; 1300.  MinimumLot Size = 2000; Safety Stock = 500; Beginning Inventory = 1000.


2.            A college bookstore opens a booth and buys back used books during final exam week.  From 9 to 12 in the morning students arrive at the rate of 40 per hour.  The bookstore employee can service 50 students per hour.  What is the average time in minutes that a student will be in the bookstore (system)?


3.            Project path A-C-E-J has these activity time estimates in days:


Activity                 Optimistic                  Most Likely                Pessimistic


     A                             3                                  4                                   5

     C                             9                               12                                 14

     E                           12                                15                                 20

     J                              7                                  9                                   9


Compute the expected time or duration for each activity, the variance for each activity, and the expected duration and variance for the path.


4.            A pipe company sells plastic pipe to water companies.  Historic demand for the past 40 weeks is shown below:


Sales              Weeks

5K – 10K             4

11K – 20K        12

21K – 30K       16

31K – 40K          8

            If the company wanted to do aMonte Carlosimulation analysis, what would the random number assignments to the sales classes be?


5.            What 7 steps should a company plan for in order to successfully convert to a JIT system?


6.            Two separate operations are required to complete a product.  Use Johnson's rule to sequence the following six jobs using the given times.


Job                  Operation 1               Operation 2

  A                          1.6 hrs.                       1.9 hrs.

  B                          1.3                               1.1

  C                          1.5                               1.7

  D                          1.6                               1.4

  E                          1.5                               1.2

  F                           2.0                               1.6


7.            Draw a Gantt chart that shows how the following five classes can be scheduled into two classrooms, A and B:  Business Development from 9 AM to 11:45 AM; Market Research from 2 PM to 4:45 PM; Operations Management from 8 AM to 10:45 AM; Case Problems from Noon to 2:45 PM; and Managerial Finance from 11 AM to 1:45 PM.  Leave a 15 minute period between classes for students to come and go.


8.            What is the difference between repair and preventive maintenance?


9.            An airline has 20 planes, is short on money, and doesn't want to spend any more than necessary to keep the planes safely flying.  The cost to perform preventive maintenance (PM) on all 20 planes is $16,000.  If a plane has a malfunction between PM inspections, it costs an average of $4000 to fix it.  The malfunction history on the planes is as follows:


Months between PM                       Probability of malfunction

            One                                                                .2

            Two                                                                 .3

            Three                                                              .5


            How often should PM occur to minimize the total expected costs?


10.         You need the following to produce Product A: 1 B per A; 1 C per A; 1 D per B; 1 E per B; 2 F per C; 1 G per C, and 2 E per G.  If you have the following on hand, how many more of each would you have to produce to have 120 A?  On hand: 30 A; 10 B; 50 C; 50 D; 125 E; 0 F; and 30 G.



Solution Description


9. operation_management_0.doc