IT 244 week 3 Assignment Disaster Recovery Plan - 10141

Solution Detail
Price: $8.00
  • From: ,
  • Posted on: Tue 22 May, 2012
  • Request id: None
  • Purchased: 0 time(s)
  • Average Rating: No rating
Request Description

1.     Assignment:  Disaster Recovery Plan

 

Purpose of Assignment

 

Students are required to analyze the mission-critical business processes and risks for their selected business scenario to relate business continuity to disaster recovery planning. Students identify an appropriate disaster recovery strategy based on their analysis and develop a test plan for their disaster recovery plan.

 

Resources Required: Appendix D

 

·      Complete the Disaster Recovery Plan (DRP) portion of the Information Security Policy. Include the following:

 

    • The key elements of the DRP
    • The plan for testing the DRP

 

·         Refer to the Disaster Recovery Plan Template in Appendix D for the correct format for this assignment.

 

Grading Guide

 

Appendix D corresponds to Section 3 of Appendix B in the final compilation due in Week Nine.

 

Grading Form for Disaster Recovery Plan, Due in Week Three

Content and Development  70 Points

Points Earned XX/70

All key elements of the assignment are covered in a substantive way.

 

•     The paper describes the key elements to be used in case of disaster for the selected business scenario. It includes a plan for testing the DRP.

 

•     Section 1.1 covers the risk assessment portion of the DRP.

 

o    Section 1.1.1 lists the mission-critical business systems and services

 

o    Section 1.1.2 discusses the internal, external, and environmental risks likely to impact the business

 

•     Section 1.2 identifies the disaster recovery strategies that are most appropriate and why

 

•     Section 1.3 describes the DRP test plan and testing rationale for the selected scenario for the following

 

o   Section 1.3.1 Walk-throughs

 

o   Section 1.3.2 Simulations

 

o   Section 1.3.3 Checklists

 

o   Section 1.3.4 Parallel testing

 

o   Section 1.3.5 Full interruption

 

The content is comprehensive, accurate, and persuasive.

 

The completed project sections develop a central theme or idea, directed toward the appropriate audience.

 

The completed project sections link theory to relevant examples and uses the vocabulary of the theory correctly.

 

Major points are stated clearly; are supported by specific details, examples, or analysis; and are organized logically.

 

Readability and Style  15 Points

Points Earned XX/15

Paragraph transitions are present, logical, and maintain the flow throughout the paper where applicable.

 

The tone is appropriate to the content and assignment.

 

Sentences are complete, clear, and concise.

 

Sentences are well constructed, with consistently strong, varied sentences.

 

Sentence transitions are present and maintain the flow of thought.

 

Mechanics  15 Points

Points Earned XX/15

The completed project sections follow formatting as indicated in the Appendix D template.

 

The completed project sections are laid out with effective use of headings, font styles, and white space.

 

Rules of grammar, usage, and punctuation are followed.

 

Spelling is correct.

 

Total 100 Points

Points Earned XX/100

Overall Comments:

 

Solution Description

1.     Assignment:  Disaster Recovery Plan

 

Purpose of Assignment

 

Students are required to analyze the mission-critical business processes and risks for their selected business scenario to relate business continuity to disaster recovery planning. Students identify an appropriate disaster recovery strategy based on

Attachments
IT 244 Week 3 - Appendix D (Disaster Recovery Plan).docx
IT 244 Week 3 -...