Goldratt's rule of production scheduling include all but: 

A. An hour saved at a non-bottleneck is a mirage 

B. A process batch should be fixed both along its route and in time 

C. Do not balance the capacity - balance the flow 

D. Utilization and activation of a resource is not the same thing 

 
Solution Description

Goldratt's rule of production scheduling include all but: