Goldratt's rule of production scheduling include all but:

     a. Do not balance the capacity - balance the flow

     b. Utilization and activation of a resource is not the same thing

     c. An hour saved at a non-bottleneck is a mirage

     d. A process batch should be fixed both along its route and in time

     e. Priorities can be set only by examining the system's constraints

 