Devry BIS311/BIS 311 Week 1 Quiz (Score 100%) - 93239

Solution Posted by
anjis_devis

anjis_devis

Rating : (20)B
Solution Detail
Price: $17.00
Request Description
Question Question 1. 1. (TCO 1) A(n) _____ is a container that stores the projects and files for an entire application. (Points : 1) window solution interface package Question 2. 2. (TCO 3) The programming process begins with a meeting between the programmer and the client. Which of the following activities is the last activity in the programming process? (Points : 1) Build the user interface. Code the application. Test and debug. Assemble the documentation. Question 3. 3. (TCO 1) All the objects in an object-oriented program are created (instantiated) from a _____. (Points : 1) project form class property Question 4. 4. (TCO 3) At design time, the programmer can change the form's background color by changing the form's _____ property. (Points : 1) BackGround Color BackColor ForeColor Question 5. 5. (TCO 1) When you click the ellipsis (...) button in the Settings box of the Font property, _____. (Points : 1) a list of font styles appears a color palette appears a dialog box opens the attribute is removed Question 6. 6. (TCO 3) The character used to create an access key by inserting it into a text property is _____. (Points : 1) ~ ^ & + Question 7. 7. (TCO 1) The Toolbox window _____. (Points : 1) displays the names of the projects and files included in a solution displays data connections and servers displays the tools you use when creating your application's interface displays the classes, methods, and properties included in a solution Question 8. 8. (TCO 3) In Windows applications, pressing the _____ and Tab keys simultaneously moves the focus backwards. (Points : 1) Shift Ctrl Alt Ctrl + Shift Question 9. 9. (TCO 1) A label's _____ property determines the value that appears inside the label on a form. (Points : 1) Caption Name Text Values Question 10. 10. (TCO 3) Short, English-like phrases that are written to represent the steps a program must take to solve a particular problem are called _____. (Points : 1) flowcharts pseudocode object code macro code Question 11. 11. (TCO 1) The _____ function key will start a Visual Basic 2012 application in the IDE. (Points : 1) F2 F3 F4 F5 Question 12. 12. (TCO 3) A(n) _____ is a predefined procedure that performs a specific task and then returns a value. (Points : 1) algorithm function Sub procedure class Question 13. 13. (TCO 1) A(n) _____ is a predefined procedure that you can call (or invoke) when needed. (Points : 1) method object class event Question 14. 14. (TCO 3) In the mathematical expression 4 * 3 + 15 / 3 - 6, which operation is performed last? (Points : 1) + - * / Question 15. 15. (TCO 2) Software developers and programmers use _____ to develop the logic of a solution prior to coding the solution. (Points : 1) flowcharts and pseudocode algorithms instructions All of the above Question 16. 16. (TCO 2) The third column in a TOE chart lists _____. (Points : 1) objects to be used in an application’s tasks tasks the application must perform events that cause the application to perform tasks errors that may occur when running the application Question 17. 17. (TCO 3) A rectangle on a flowchart represents _____. (Points : 1) an input or output operation the beginning of the application a processing step such as a calculation the end of the application Question 18. 18. TCO 2) In the V-Model of systems development, usability and acceptance testing verifies the correctness of _____. (Points : 1) implementation design analysis unit testing Question 19. 19. (TCO 2) Correcting coding defects found in an application is called _____. (Points : 1) deploying documenting debugging designing Question 20. 20. (TCO 3) The backslash () operator in Visual Basic performs _____. (Points : 1) exponentiation integer division multiplication negation
Solution Description

Question

Question 1. 1. (TCO 1) A(n) _____ is a container that stores the projects and files for an entire application. (Points : 1)

window

solution

interface

package

Question 2. 2. (TCO 3) The programming process begins with a meeting between the programmer and the client. Which of the following activities is the last activity in the programming process? (Points : 1)

Build the user interface.

Code the application.

Test and debug.

Assemble the documentation.

Question 3. 3. (TCO 1) All the objects in an object-oriented program are created (instantiated) from a _____. (Points : 1)

project

form

class

property

Question 4. 4. (TCO 3) At design time, the programmer can change the form's background color by changing the form's _____ property.

Attachments
devry_BIS311_week_1_quiz.docx
devry_BIS311_we...