The first step in activity-based costing is to

A.  assign manufacturing overhead costs for each activity cost pool to products. 

 B.  compute the activity-based overhead rate per cost driver. 

 C.  identify and classify the major activities involved in the manufacture of specific products. 

 D.  identify the cost driver that has a strong correlation to the activity cost pool. 

 